02 — Approach

Integrated teams and a delivery model built for scrutiny

Externally financed programmes are judged on documentation as much as on concrete. We are organised so that both hold up.

Delivery model

Four stages, one accountable team

We do not hand an assignment between departments. The people who run the surveys brief the designers, and the designers stay engaged through supervision and handover.

Stage 01

Mobilise and investigate

Team mobilisation, counterpart engagement and the field evidence base.

  • Topographic, geotechnical and hydrological survey
  • Baseline and gap assessment
  • Stakeholder and community consultation
  • Socio-economic and environmental data collection
Stage 02

Design and appraise

Turning evidence into a defensible technical and financial proposition.

  • Options analysis and feasibility
  • Preliminary and detailed engineering design
  • Bills of quantities and cost estimates
  • Economic, financial and safeguards due diligence
Stage 03

Supervise and implement

Holding the works to the standard the design assumed.

  • Tender documentation and subcontracting
  • FIDIC contract administration
  • Construction supervision and quality control
  • Safeguards monitoring and progress reporting
Stage 04

Hand over and institutionalise

Making sure the asset and the institution both keep working.

  • Commissioning and performance testing
  • Operation and maintenance manuals
  • Operator and counterpart training
  • Institutional and regulatory strengthening
Integrated teams

The disciplines we bring to the table

A typical SSC team is assembled across engineering, environmental, social and institutional disciplines from the outset, so that safeguards and operability shape the design rather than being appended to it.

We maintain a roster of national specialists and a network of international key experts, mobilised assignment by assignment against the terms of reference.

Civil & water engineering Hydrology Geotechnics Urban & transport planning Environmental engineering GIS & remote sensing Economists Utility finance Regulatory & institutional Social & gender safeguards Resettlement Disaster risk management Capacity development Systems integration
Trainees in hard hats and high-visibility vests holding their training certificates
The first ½ shift receives certificates after training at the DongDok University facility.
Engagement models

Two ways clients appoint us

Sole consultant

We carry the full scope and the full responsibility — survey, design, tendering, supervision, commissioning and handover — reporting directly to the project director and the client's project management committee.

Delivered this way: the countrywide police communications network across 150 sites in 17 provinces; the Vientiane Capital CCTV and alarm system; the Burapha plywood mill; the Vientiane Capital Mekong embankment.

National partner in an international consortium

We provide the key and non-key national experts, the field and survey capability, the safeguards work and the counterpart interface that the prime consultant's design depends on — under the prime's quality system and reporting framework.

Delivered this way: the Second GMS Tourism Infrastructure Project with Ramboll; the FLEGT forest governance programme with NIRAS IP Consult for KfW; ADB water sector and tourism facility technical assistance.

Governance

Quality assurance and project governance

Our systems are built to the documentation and compliance standards of the institutions that finance our work.

Project controls

Defined project director and project manager roles, scheduled progress reporting, change and variation control, and a documented issue escalation route to the client's project management committee.

Quality management

Quality management, assurance and control applied to deliverables and to works — including inspection and test planning, non-conformance handling, and independent review before issue.

Compliance and reporting

Periodic updates and documentation prepared for compliance with ADB, KfW, GIZ, EU and Government of Lao PDR requirements, including monitoring and evaluation of achievements against agreed indicators.

Environmental safeguards

Updating, implementation, monitoring and review of environmental safeguards documents, IEE and ESF packages through the construction period.

Social safeguards and gender

Involuntary resettlement, indigenous peoples, poverty and social analysis, and gender and social development plans — implemented and monitored in the field, with community engagement throughout.

Climate and disaster risk

Climate-resilience screening and disaster-risk review, including early-warning considerations, integrated into design rather than assessed after it.

Next step

Want the detail behind this?

We can share our company profile, reference sheets and CVs of proposed key experts in the format your procurement requires.