Establishing the biodiversity baseline before tourism infrastructure is built
Biodiversity reconnaissance survey for the Initial Environmental Examination of subprojects MF1 and MF7 — ADB TA 6899-REG, GMS Smart and Sustainable Tourism Infrastructure for Inclusive Growth Project, Meuang Feuang District, Vientiane Province.
A rapid, defensible baseline for a karst and river landscape
Before road upgrading and cycle paths are designed into one of Lao PDR's best-known nature destinations, the project needs to know which habitats and species of conservation concern lie within their reach.
The two subprojects sit in a scenic karst-riverine landscape along the Nam Lik River: MF1, upgrading almost 15 km of existing gravel roads to the Nam Lik reservoir to create a 22 km tourism loop, and MF7, 10.7 km of concrete cycle paths along the river's left bank. The survey had to establish a preliminary baseline, identify potential impacts during construction and operation, and recommend mitigation — to the standard required by the ADB Safeguard Policy Statement.
How the survey was done
The area of influence was divided into four survey blocks — Pha Pou, Pha Teung, the Nam Lik reservoir and downstream, and Pha Leuang. A desk review of the IBAT database, the IUCN Red List and earlier hydropower assessments was followed by key-informant interviews in the project villages and dry-season fieldwork: habitat mapping along the alignments, bird point counts, day and night transects, mist-netting for bats at cave and cliff sites, a boat survey on the reservoir, and on-site species identification.
Records were assessed against IFC Performance Standard 6 criteria for Critical Habitat over an ecologically appropriate area of analysis, and potential impacts were classified with a magnitude-by-sensitivity matrix, following the mitigation hierarchy for recommendations.
Our role
SSC commissioned and managed a specialist survey team led by Dr. Phaivanh Phiapalath, with specialists in forestry, herpetofauna and fish, GIS support and participation from provincial agriculture and environment staff. The work was coordinated for the project preparation team by SSC's national environmental and climate change specialist, so the survey fed directly into the subprojects' environmental assessment.
Project facts
- Financier
- Asian Development Bank
- Programme
- TA 6899-REG — Southeast Asia Sustainable Tourism Facility; GMS SSTIIGP (55249-001)
- Location
- Meuang Feuang District, Vientiane Province, Lao PDR
- Subprojects
- MF1 Nam Lik reservoir access improvements; MF7 Meuang Feuang scenic cycle paths
- Fieldwork
- April 2026, dry season
- Period
- March – May 2026
- Survey lead
- Dr. Phaivanh Phiapalath
- SSC role
- Commissioning, management and quality control of the survey
- Project manager
- Per Gradin
From village interviews to night surveys






Photographs: biodiversity reconnaissance survey team, April 2026.
Other assignments

Second GMS Tourism Infrastructure for Inclusive Growth
Climate-sensitive urban design through detailed engineering design and construction supervision.

Integrated smart city planning for Luang Prabang
National sub-consultant to Ramboll on an integrated urban strategy for a World Heritage city.
Need a biodiversity or environmental baseline in Lao PDR?
We field experienced national and regional specialists and manage the survey to the standard your financier's safeguards require.