Case study · Agro-industry

A USD 25 million industrial plant, from bare ground to 400 staff

Construction and realisation of a state-of-the-art, vertically integrated plywood factory for Burapha Agro-Forestry Co., Ltd., Lao PDR — financed by FMO, Finnfund and private investment.

The assignment

Owner's engineer, project manager and the bridge into operations

SSC managed contractor management, supervised and project managed all civil works of USD 15 million as well as all other related industrial investments of USD 10 million, under FIDIC modality.

Industrial projects financed by development finance institutions carry two risks that rarely appear on the drawings. The first is interface risk — a civil contractor, a process equipment supplier and an owner's team each working to a different schedule. The second is the operational cliff at the end: a completed factory with nobody trained to run it.

The scope was structured to address both.

Construction and delivery

We organised and tracked all work to be done by all stakeholders, established the schedules, and ran communications on the development of the mill project to the company's staff and to every stakeholder. Contractor management, supervision and project management covered the full civil works package and the associated industrial investment.

Transition into operations

In parallel we coordinated and supervised all in-company development activities required for the start of operations: factory organisation, corporate structure, coordination of staff recruitment for more than 400 people, and training. SSC acted as lead on the coordination and support for the transition from the project phase into normalised operations of the mill.

That is the part most owner's engineer appointments stop short of. It is also the part that determines whether the investment produces plywood or produces a building.

Project facts

Client
Burapha Agro-Forestry Co., Ltd., Lao PDR
Financing
FMO, Finnfund and private investment
Period
October 2019 – December 2021
Total value
USD 25 million
SSC value of services
USD 0.65 million
Contract modality
FIDIC
SSC role
Project management, construction supervision, contractor management and operational transition
Project manager
Per Gradin
FIDIC Owner's engineer Civil works USD 15m Plant USD 10m 400+ staff recruited Commissioning
Aerial view of the Burapha plywood mill under construction, showing the main production hall and site works
The mill under construction — main production hall, auxiliary buildings and site works.
From the air

The Burapha plywood mill by drone

Drone footage of the mill and its site, December 2022 (5 min 18 s).

Burapha plywood mill, Lao PDR — drone video, December 2022. Open the video file (MP4, 83 MB).
Workers grouting a steel column base during construction
Steel column grouting — the supervision detail that decides whether the frame stands true.
Mobile crane lifting a roof truss into position over the cutting line canopy
Cutting line canopy roof being lifted into place.
Project team in high-visibility clothing at the completed press line
The project team at the completed press line.
Eight-foot veneer peeling line installed inside the production hall
The eight-foot peeling line, installation complete.
Pre-start meeting and inspection with the site workforce assembled under the structure
Pre-start meeting and inspection — safety and sequence briefed to the full site workforce.
Completed production hall with presses and conveyors installed
The completed production hall approaching commissioning.
Scope in summary

What the appointment covered

Contractor management

Supervision and project management of all civil works and related industrial investment under FIDIC modality.

Programme control

Organising and tracking work across every stakeholder, establishing schedules and holding them.

Stakeholder communication

Structured communication on project development to company staff and all stakeholders throughout.

Operational readiness

Factory organisation, corporate structure, recruitment coordination for 400+ staff, training and the handover into normalised operations.

For investors and lenders

Building an industrial asset in Lao PDR?

We act as owner's engineer and project manager, and we stay through commissioning and the transition into operations.