From design concept to finished works, on the same team
Second GMS Tourism Infrastructure for Inclusive Growth Project — Vang Vieng and Nam Ngum sub-projects, Lao PDR. ADB Grant 0599-REG, with Ramboll International.
Climate-sensitive urban design, carried through to construction
Architectural, urban and landscape design concepts and Climate Sensitive Urban Design for the Vang Vieng and Nam Ngum sub-projects, progressing from conceptual design through detailed engineering design and construction supervision of civil works.
Tourism infrastructure in Lao PDR has to do two things at once: serve visitor economies that are growing quickly, and serve the residents who live with the result. The sub-projects were designed on that basis — public realm and environmental services, not visitor attractions.
Works covered
Marina and access road improvements; public market and shophouse redevelopment; urban renewal including footpaths, drainage and traffic calming; riverbank protection; and wastewater and sanitation infrastructure — septic tanks, a wastewater pump-out station and holding tank, decentralised wastewater treatment systems, storm-water drainage and solid waste management.
Our role
SSC provided the full team of national experts for design and supervision. That covered desktop review, site missions, design workshops, preliminary and final design concepts, and integration of those concepts into the detailed engineering design and works supervision.
In parallel, under the same programme, SSC carried out the detailed topographic, geotechnical and hydrological surveys for the seven TIIGP2 sub-projects — to a standard of accuracy and completeness sufficient to enable detailed engineering design and bills of quantities for roads, bridges, drainage, embankments and solid waste and wastewater disposal sites, in densely developed urban areas and in remote rural terrain.
We also provided institutional development consultants to the wider GMS Tourism Infrastructure for Inclusive Growth Project under ADB Loan 3156, completing the operation and maintenance manuals for the civil works structures, roads and bridges — the documents that guide how the assets are maintained after handover.
Project facts
- Client
- Ministry of Information, Culture and Tourism, Lao PDR
- Prime consultant
- Ramboll International
- Financier
- Asian Development Bank — Grant 0599-REG
- Reference
- TIIGP2-LAO-C01
- Period
- August 2019 – ongoing
- Total value of services
- USD 47 million
- SSC value of services
- USD 1.45 million
- SSC role
- National expert team — design, survey and construction supervision
- Project manager
- Per Gradin
One team from survey to supervision
The same firm ran the topographic, geotechnical and hydrological surveys, sat in the design workshops, and then supervised the contractor on site. When a site condition contradicted the design assumption, there was no interface to negotiate — the people who took the measurement were the people resolving it.
That continuity is one of the strongest safeguards for schedule and specification.
Other assignments

Urban water supply and sanitation sector reform
Regulatory reform, tariff modelling and national capacity development for the Department of Water Supply.

Burapha Agro-Forestry plywood mill
Owner's engineer and project manager for a USD 25 million industrial investment.
Bidding a programme that needs a national partner in Lao PDR?
We have delivered inside international consortia on ADB, KfW and EU-financed programmes, under the prime's quality and reporting systems.